Infrastructure axis – Excavation
A ditch for the rainwater evacuation system was dug along the main axis of Bene Baraque, which is lined by market stands.
Excavating along a narrow street while daily life continues – a logistical challenge.
Stéphan Senghor, CEO of project partner Groupe Senghor, discusses solutions with partners and construction workers from Bene Baraque.
Construction workers dig further drainage ditches at street level.
Pipes for stormwater evacuation and the simplified sewer system are being laid.
Pipes being covered with soil, ready to be compressed and paved.
The street is being paved.